CEF

SDE Group we approached by City Electrical Factors to help design their new on line Distribution Centre in Biggleswade.

 

Working under a Main Contractor the scope was to deliver a two tier mezzanine floor along with a one hour fire rated ceiling, VNA pallet racking for storage of bulk pallets, a specially designed conduit rack for long products and coil racking.

In addition to this, SDE Group liaised closely with the conveyor supplier to ensure that every level had automated coverage.

Location

Biggleswade, England

Services

○ High Bay Pallet Racking Design

○ Cantilever Racking Design

○ Racking Installation

○ Mezzanine Floor

  • Facebook white
  • Instagram white
  • Linkdin white